Computer Systems Validation

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg
Showing posts with label Validation. Show all posts
Showing posts with label Validation. Show all posts

Monday, 5 November 2012

Process Control Systems GAMP 5 Software Categories

Posted on 11:00 by Unknown
In the article Validation Determination the use of categorising software was discussed and how this can support the approach to the validation. In this post we are looking at types of software which fall in to these categories for Process Control Systems / Automation Systems.

Categorising software is used to support the approach to the validation based on complexity and novelty of the
Read More
Posted in GAMP 5, Validation | No comments

Wednesday, 1 December 2010

CSV Periodic Review

Posted on 12:11 by Unknown
Regulatory requirement
Both the FDA and EU GMP’s detail the requirement for demonstrating that a computer system remains in a validated state throughout its operating history.

FDA 21 CFR 211.68(b) States:
“Input to and output from the computer or related system of formulas or other records or data shall be checked for accuracy. The degree and frequency of input/output verification shall be based
Read More
Posted in GAMP 5, Validation | No comments

Thursday, 19 August 2010

Spreadsheet Validation

Posted on 12:08 by Unknown
Spreadsheets have become commonly used within a wide range of applications within the pharmaceutical and biotechnology industries. These range from the management of documentation lists through to complex algorithms used to support batch release.

This post provides a description of a risk based approach to the validation of spreadsheets. As with all posts comments are welcome.
The approach to
Read More
Posted in Spreadsheets, Testing, Validation | No comments

Monday, 31 May 2010

What is a risk based approach?

Posted on 07:47 by Unknown
As discussed in a previous article (Changes in Validation) a risk based approach to computer systems validation has change the way validation is performed.

Spend LessMany in the pharmaceutical and biotech industries miss understood the message of a Risk Based Approach as an opportunity to take quality risk and spend less on the introduction of new equipment; that is to take a risk.

However this
Read More
Posted in Quality Risk Management, Validation | No comments

Tuesday, 11 May 2010

Efficient Software Testing

Posted on 10:00 by Unknown
Testing, as with all validation activities, is not only performed to demonstrate regulatory compliance but to ensure that the system operates correctly.

The level of testing performed should be dependant on the complexity, maturity and criticality of the system.

A standard laboratory instrument should not need the same level of testing as a bespoke automated control system. This is where the
Read More
Posted in GAMP 5, Testing, Validation | No comments

GAMP5 Software Categories

Posted on 08:17 by Unknown
As discussed in ISPE GAMP 5 the GAMP Categories for hardware and software have been retained in GAMP 5, all be it in a modified format from GAMP4.

The software categories identified in GAMP 5 do not fit with determining the risk to product quality, efficacy or data integrity and no longer plays an integral part to determining that a computer system is fit for purpose.

The complexity and the
Read More
Posted in ASTM-2500, GAMP 5, Validation | No comments

Changes in validation

Posted on 06:24 by Unknown
There have been many changes to the approach to validation of equipment, including computerised systems over the last few years. This has culminated in the release of GAMP 5 in 2008.

The changes in approach started with the publication of the ICH Q9 (Quality Risk Management) in 2005 and adopted by the major agencies. This presented a risk based approach to quality management including validation
Read More
Posted in GAMP 5, Quality Assurance, Validation | No comments
Home
Subscribe to: Posts (Atom)

Popular Posts

  • CSV Periodic Review
    Regulatory requirement Both the FDA and EU GMP’s detail the requirement for demonstrating that a computer system remains in a validated stat...
  • Auditing Software Suppliers (Part 1)
    Introduction to Software Supplier AuditsThis blog is the first of a series of planned articles on the process for quality system auditing su...
  • 21 CFR Part 11 Warning Letters
    From the review of the FDA Warning Letters I could not find any observations for pharmaceutical or biotechnology companies directly citing n...
  • Spreadsheet Validation
    Spreadsheets have become commonly used within a wide range of applications within the pharmaceutical and biotechnology industries. These ran...
  • Software Validation
    The validation of computer software within the Pharmaceutical Industry is providing documented evidence that the software and computer syste...
  • Applying Computer System Security (GAMP)
    It is a regulatory requirement that access to computerised systems is limited to authorised users. This not only limited to systems that con...
  • CSV FDA Warning Letter : Periodic Review
    Date: 21 May 2010 Link: FDA Warning Letter (New Window) Observation6. Your firm failed to check the accuracy of the input to and output from...
  • Deleting Electronic Data
    Hybrid Systems (Deleting Electronic Data) In Hybrid systems the computerised system is used to generate a record which is printed and hand s...
  • FDA Announce Part 21 CFR 11 Inspections
    Image via WikipediaAs detailed within the post 21 CFR Part 11 Warning Letters the FDA are planning to start conducting part 11 inspections s...
  • FMEA for Computer Systems
    I have published an article on the Computer Systems Validation web site (www.csv-qa.com) for performing Failure Mode Effect Analysis (FMEA) ...

Categories

  • 21 CFR Part 11
  • ASTM-2500
  • Electronic Records
  • EU Annex 11
  • FDA News
  • FDA Warning Letters
  • GAMP 5
  • MHRA
  • Quality Assurance
  • Quality Risk Management
  • Spreadsheets
  • Supplier Audit
  • Testing
  • Validation

Blog Archive

  • ▼  2012 (6)
    • ▼  November (1)
      • Process Control Systems GAMP 5 Software Categories
    • ►  August (1)
    • ►  July (1)
    • ►  April (1)
    • ►  February (1)
    • ►  January (1)
  • ►  2011 (14)
    • ►  December (2)
    • ►  September (1)
    • ►  May (1)
    • ►  April (3)
    • ►  March (3)
    • ►  February (4)
  • ►  2010 (26)
    • ►  December (2)
    • ►  August (1)
    • ►  July (2)
    • ►  June (7)
    • ►  May (14)
Powered by Blogger.

About Me

Unknown
View my complete profile